all-tilt-up-constructions-kings-park-project-7.jpg

Being awarded the construction for Pirtek Fluid Systems base building, 7 Garling Road Kings park followed a rigorous interview and tender process which resulted in ALL TILT UP CONSTRUCTIONS securing the Design and Construction contract

All Tilt Up Construction suggested several engineering alternatives that allowed the tenant greater flexibility for the fit out and provide a greater level of redundancy for future tenant uses. We were awarded the project because of our ability to ensure and demonstrate that the coordination between the base building and future fit out was not compromised with key delivery dates and design elements being met.

 
 
all-tilt-up-constructions-kings-park-completed-project
all-tilt-up-constructions-kings-park-completed-project
all-tilt-up-constructions-kings-park-nsw-completed-project-2